XICHI ELECTRIC CO., LTD.

STOCK CODE 831081
Home / News / Company News / Technical Exchange between Xichi and Water Conservancy and Hydropower Design Institutes

Technical Exchange between Xichi and Water Conservancy and Hydropower Design Institutes

Author: Site Editor     Publish Time: 2022-08-23      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Recently, a five-member marketing team led by Wang Fei, deputy general manager of Xichi Electric, traveled from South China to Southwest China to North China, which lasted for a month. They went to China Water Resources Pearl River Planning, Surveying & Designing Co.,Ltd.(Figure 1), Yunnan Water Conservancy and Hydropower Survey and Design Institute(Figure 2) and Neimenggu Water Conservancy and Hydropower Survey and Design Institute(Figure 3) to carry out in-depth technical exchanges with experts.

China variable frequency drive fan-XiCHiElectric3 phase Motor Soft Starter Supplier-XiCHiElectricpower quality management company-XiCHiElectric

During the exchange meeting, our company introduced the technical advantages, performance characteristics and industrial applications of soft starters, variable frequency drives and power quality products from multiple dimensions, and conducted in-depth discussions on the questions raised by experts. At the same time, the leaders and experts of Water Conservancy and Hydropower Design Institutes affirmed the achievements of Xichi Electric in the field of water conservancy and hydropower industry, and reached a preliminary consensus on the next step of cooperation.


Through a series of exchange activities during this trip, the friendly relationship between Xichi Electric and the Water Conservancy and Hydropower Design Institutes has been deepened, the foundation of cooperation has been consolidated, and the popularity and influence of the Xichi brand have been enhanced.


List of Partial projects of Xichi Electric Water Conservancy Project in recent years:

  • Baihetan Hydropower Plant

  • Ludila Hydropower Station

  • Longyangxia Hydropower Station

  • South-to-North Water Diversion Project

  • Yellow River - East Water Transfer Project

  • Yellow River-to-Qingdao Water Diversion Project

  • Chuo’er River-to-Xiliao River Water Diversion Project

  • Dongjiang Lake Water Diversion Project

  • Yellow River Diversion and Irrigation Project

  • Dong River Water Diversion Project

  • Tao River Water Transfer Project

  • Guihouxi Water Diversion Project

  • Yutan Reservoir Expansion Project

  • Tonghua Water Intake Migration Project

  • Nazun River Drainage Pumping Station

  • Tianmu Lake Energy Storage Power Station

  • Changnan Raw Water Pump Station

  • Rongshui Danjiang Flood Control and Drainage Pumping Station

  • Xijin Electric Power Pumping Irrigation Station

  • Anhui Rainwater Storage and Regulation Flood Control and Drainage

  • Comprehensive management of ecology in the Chenghai watershed


Product Categories

Make the company a leading professional service provider of power electronic product manufacturing solutions.
We are looking for distributor partners!
Interested? Just contact us if you have any ideas.

CONTACT US

 +86-29-88626546
 knight.liu@xichi.com
 Headquarters Address: Block B, Xi'an National Digital Publishing Base, No.996, Tianguqi Rd, High-tech Zone, Xi'an, Shaanxi, China
 Production Base: No.2, West Qinlingsi Rd, Caotang Technology Industrial Base, High-tech Zone, Xi'an, Shaanxi, China
Copyright ©2024 XI'AN XICHI ELECTRIC CO., LTD.  Sitemap